Authors
- Disclosure Date
- 2024/10/10
- Disclosure Status
- Disclosed
- Doc Name
- Environmental and Social Impact Assessment Nepal Strategic Road Connectivity and Trade Improvement Project (P170409)
- Lending Instrument
- Investment Project Financing
- Pages
- 129
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- NP-Nepal Strategic Road Connectivity And Trade Improvement Project -- P170409
- TF No/Name
- TF0B1787-Boosting the Performance of Selected Key Corridors in Nepal,TF0B5118-Capacity building and implementation support to the National Road Safet
- Unit Owning
- Transport-SAR (ISAT1)
- Version Type
- Final
Table of Contents
- Annexure 6.3 Educational and Health Institutes along KDP Road 52
- Annexure 7.1 Road Safety Management Plan 54
- Road Safety Management Plan 55
- Background 55
- Accident Crash Analysis and Result 55
- Narrow Bridges to be retained 55
- Road side Settlement and Ribbon Development 56
- Major Junctions 57
- Human behavior consideration 57
- Sharp Curves and Poor Line of Sight 57
- Geometric Layout of Proposed Highway 59
- Speed Management and Control 61
- Access Realization and Control 64
- Intersections 64
- Service Road Plan and Operation 68
- Street Lighting 70
- Safety of Vulnerable Users Groups and Pedestrian Crossings 71
- Safety Measures Road and Roadside 73
- The Plan of Intersection for Urban Sections 73
- Safety Treatments along Urban Sections 74
- Safety Treatments along Rural Sections 75
- Considerations in the Designing of Traffic Safety Facility 75
- Traffic Signs 76
- Pavement Marking 76
- Visibility Enhancement Facility 76
- Raised Pavement Markers Road Studs 76
- Emergency Parking 77
- Bus Shelters in the Service Road 77
- Bus Bay in the Main Carriageway 79
- Truck Lay-Bye 79
- Star Rating for the Proposed Design Highway 79
- Annexure 7.2 81
- Occupational Health and Safety Management Plan 82
- Emergency Response Plan 82
- Job Hazard Analysis 82
- First Aid Base 82
- On-Site Safety Publicity 82
- Safety Equipment and Clothing 82
- Annexure 7.3 Labour Camp Management Plan 84
- Labour Camp Management Plan 85
- Setting up of Camps 85
- Sanitation and Hygiene 85
- Water Supply 85
- Storm water and Waste-Water Management 85
- Water supply waste water and sewage treatment 85
- Solid Waste Management 85
- Health care awareness and clinics 85
- Welfare of Labour on construction site 86
- Shelter 86
- Canteen Facilities 86
- First aid facilities 86
- Day Crèche Facilities 86
- Safety of Labour 86
- Annexure 7.4 Standard Operating Procedures for Pollution Spills and Management of Fuels and Hazardous Substances 87
- Standard Operating Procedures for Pollution Spills and Management of Fuels and Hazardous Substances 88
- Chemicals handling planning 88
- General Safety Requirements 88
- Chemicals Usage 89
- Handling Chemicals 89
- Storage of Chemicals 89
- Control and Monitoring Activities 90
- Abnormal Conditions and Emergency Situations 90
- Annexure 7.5 Solid Waste Management Plan 92
- Solid Waste Management Plan 93
- Identification and Segregation of Wastes 93
- Reduction Initiatives 93
- Reuse Initiatives 93
- Recycling Initiatives 93
- Disposal 93
- Annexure 7.6 Traffic Management Plan 94
- Traffic Management Plan 95
- Traffic Control Zone 95
- Transition Zone 95
- Working Zone 96
- Terminal Transition Zone 96
- Other Aspects 96
- Traffic Control Devices 97
- Annexure 7.7 Rehabilitation and Reinstatement Management Plan 98
- Rehabilitation and Reinstatement Management Plan 99
- Annexure 7.8 Soil and Erosion Control Plan 100
- Annexure 7.9 Action Plan for HIVAIDS 102
- Action Plan for HIV AIDS 103
- Annexure 7.10 Action Plan for GBVSEASH 106
- Gender Based Violence Sexual Exploitation and Abuse Sexual Harassment GBVSEASH Risk Mitigation and Action Plan 107
- GBVSEASH Risk Mitigation Action Plan 108