Where practical IBAs are to be emailed to the NCCNIBA@artc.com.au the day prior to the Closedown, the IBA must contain the Network Control Board for the IBA in the Subject field. [...] Before booking out level crossing warning equipment the Competent Worker must check with the PPO to ensure no rail traffic is approaching the level crossing and advise the PPO of the name and contact number of the Handsignaller at the level crossing. [...] o Communicating any and all conditions or restrictions of tracks within the site o Any IBA’s relating to points or level crossings are identified and the use or restrictions on the use of the equipment • Once a new Coordinating PO has been selected and if the worksite protection arrangements change, the PPO must be notified of the new arrangements. [...] New Worksites Entering the LPA: Where a new workgroup is to establish a worksite in a section where Lookout Working is in place • The PPO must advise the PO of the workgroup of the Lookout Working workgroup contact details and the Lookout Working limits, • The new workgroup PO must contact the PO for the Lookout Working workgroup and make agreed arrangements for the works to be completed, • If the. [...] Entering an existing worksite: Prior to entering an existing worksite in the corridor, the PO for the Lookout Working Workgroup must: • Contact the PO for the worksite and, • Gain authority from the PO to enter the pre-existing worksite and, • Get briefed into the worksite by the PO, and • Inform the PPO that the Lookout Working Workgroup has entered an existing worksite location Exiting an existi.
Authors
- Pages
- 11
- Published in
- Australia
Table of Contents
- HUNTER VALLEY 1
- NOVEMBER MAINS 1
- CLOSEDOWN 1
- Hunter Valley Closedown Briefing Document 1
- Local Possession Authority 1
- Using a Local Possession Authority 1
- Work Trains 1
- Track Vehicles 1
- Piloting Trains and Track Vehicles 1
- Planning Work in the Rail Corridor 1
- Lookout Working 1
- Lookouts 1
- Level Crossings 1
- Protecting Type F Level Crossing 1
- On Site Testing of Type F Level Crossing 1
- Using Emergency Roadside Warning Equipment 1
- Infrastructure Booking Advice 1
- Using Infrastructure Booking Advices 1
- Network communication 1
- Spoken and Written Communication 1
- Possessions Web page - httpswww.artc.com.auworkhunter-valley-possessions-management 1
- HUNTER VALLEY 2
- NOVEMBER MAINS 2
- CLOSEDOWN 2
- CLOSEDOWN TIMELINE 2
- START UP 2
- 0400 hours Sat 2 Nov Protection Officers ring on with the PPO 2
- HANDBACK 2
- 1130 hours Sun 3rdNov 2
- All Stages Certified and off track 2
- 0100 hours Mon 4thNov 2
- Hanback Mains Possession 2
- CLOSEDOWN CONTACTS 2
- PHONE PROTOCOL 2
- HUNTER VALLEY 3
- NOVEMBER MAINS 3
- CLOSEDOWN 3
- CLOSEDOWN PROTOCOL 3
- HUNTER VALLEY 4
- NOVEMBER MAINS 4
- CLOSEDOWN 4
- HUNTER VALLEY 5
- NOVEMBER MAINS 5
- CLOSEDOWN 5
- Communication Flow Chart 5
- WORKSITE SUPERVISORS 5
- HUNTER VALLEY 6
- NOVEMBER MAINS 6
- CLOSEDOWN 6
- HUNTER VALLEY 7
- NOVEMBER MAINS 7
- CLOSEDOWN 7
- HUNTER VALLEY 8
- NOVEMBER MAINS 8
- CLOSEDOWN 8
- HUNTER VALLEY 9
- NOVEMBER MAINS 9
- CLOSEDOWN 9
- HUNTER VALLEY 10
- NOVEMBER MAINS 10
- CLOSEDOWN 10
- HUNTER VALLEY 11
- NOVEMBER MAINS 11
- CLOSEDOWN 11