Authors
- Disclosure Date
- 2024/10/23
- Disclosure Status
- Disclosed
- Doc Name
- Ukraine - EUROPE AND CENTRAL ASIA- P146788- Second Power Transmission Project - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Pages
- 6
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- UA-Second Power Transmission Project -- P146788
- TF No/Name
- TF0C4020-Ukraine Technical Assistance/Support to the Energy Sector Cybersecurity,TF017661-Second Power Transmission Project - CTF Loan TF,TF018540-Ukraine - Second Power Transmission Project - MPIS Fees,TF0A7544-Development of market compatible renewable energy framework in Ukraine,TF0B5186-Strengthening resilience of the power transmission infrastructure in Uk,TF0C0819-UKR Co-financing Second Power Transmission Project,TF0C2632-PTP2 Single Donor TF Supervision,TF0C5622-QII Ukraine Cybersecurity
- Unit Owning
- Infra ECA Energy (IECEE)
- Version Type
- Final
Table of Contents
- I. General 1
- 1. Banks approval Date of the procurement Plan Original September 2014 Revision 6 of Updated Procurement Plan November 2018 1
- 2. Date of General Procurement Notice July 13 2015 1
- 3. Period covered by this procurement plan The procurement period of project covered from year July 2015 to June 2022 1
- 2. Prequalification . Bidders for Not applicable shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 1
- 3. Proposed Procedures for CDD Components as per paragraph. 3.17 of the Guidelines Not applicable 1
- 4. Reference to if any Project OperationalProcurement Manual Not applicable 1
- 5. Any Other Special Procurement Arrangements Not applicable 1
- 1. Prior Review Threshold Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants 2
- 3. Any Other Special Selection Arrangements Not applicable 2
- 4. Consultancy Assignments with Selection Methods and Time Schedule 3
- US million 3