- Revised Stakeholder Engagement Plan (SEP) Railway Improvement and Safety for Egypt Project (P175137)
- Lending Instrument
- Investment Project Financing
- Pages
- 68
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- EG-Railway Improvement And Safety For Egypt Project -- P175137
- TF No/Name
- TF0C4088-Strengthening Operational Framework for Addressing Gender Based Violenc,TF0C6170-TF072629
- Unit Owning
- Transport - MNA (IMNT1)
- Version Type
- Final
Files
Table of Contents
- Prepared by Integral Consult 1
- A Member of 1
- Environmental Alliance 1
- December 2020 1
- Cairo Office 1
- 2075 El Mearaj City Ring 1
- Road Maadi Cairo Egypt 1
- Phone 202 2 25204515 Fax 202 2 25204514 1
- Dr. Amr Osama Dr. Anan Mohamed 3
- TABLE OF CONTENTS 4
- ACRONYMS ....................................................................................................................... 1 4
- 1 Introduction ................................................................................................................... 2 4
- 1.1 Project Description ................................................................................................. 2 4
- 1.1.1 Component 1 Improvement of safety and operational efficiency on the 4
- 1.1.2 Component 2 Introduction of a safe asset management system and station 4
- 1.2 Project Site Location .............................................................................................. 3 4
- 1.2.1 Segment 1 165 Km Alexandria Arab El Raml ........................................ 4 4
- 1.2.2 Segment 2 45 Km Cairo - Benha ............................................................... 6 4
- 1.2.3 Segment 3 120 Km Cairo - Giza Beni Suef ............................................ 7 4
- 1.2.4 Segment 4 250 Km Beni Suef Asyut ...................................................... 8 4
- 1.2.5 Segment 5 180 Km Asyut Nag Hammadi ............................................... 9 4
- 2 Summary of Previous stakeholders Engagement Activities ....................................... 10 4
- Public Consultations as part of previous ESIA processes .................................... 10 4
- 2.2 Stakeholder engagement with PAPs on land issues ............................................. 15 4
- 2.3 Community Outreach by Contractors ................................................................... 16 4
- 2.4 Lessons learned from ENRRP .............................................................................. 16 4
- 2.5 Consultations as Part of Project Preparation OCT-NOV 2020 .......................... 18 4
- 3 Stakeholder identification and analysis ....................................................................... 20 4
- 4 Stakeholder Engagement Program .............................................................................. 30 4
- 4.1 Purpose and timing of stakeholder engagement program .................................... 30 4
- 4.2 Proposed strategy for information disclosure ....................................................... 30 4
- 4.3 Proposed strategy for consultation ....................................................................... 41 4
- 4.4 Proposed strategy to incorporate the view of vulnerable groups .......................... 46 4
- 4.5 Timelines .............................................................................................................. 46 5
- 4.6 Review of Comments ........................................................................................... 47 5
- 5 Resources and Responsibilities for implementing stakeholder engagement activities 5
- 5.1 Resources .............................................................................................................. 48 5
- 5.2 Management functions and responsibilities ......................................................... 48 5
- 6 Grievance Mechanism GM ....................................................................................... 49 5
- 6.1 The project GM .................................................................................................... 49 5
- Grievance Channels ..................................................................................... 49 5
- 6.2 Grievance Cycle ................................................................................................... 49 5
- 6.2.1 Grievances Tiers Composition ................................................................... 50 5
- 6.2.2 Response to Grievances ............................................................................... 50 5
- 6.2.3 Registration of Complaints .......................................................................... 51 5
- 6.2.4 Confidentiality ............................................................................................. 51 5
- 6.2.5 Management of GM ..................................................................................... 51 5
- 6.2.6 Monitoring of Grievances ............................................................................ 51 5
- 6.2.7 Disclosure of grievances .............................................................................. 52 5
- Current GM Central Institution level utilized by ENR ....................................... 52 5
- 6.3.1 Grievance Channels at the central level ....................................................... 52 5
- 6.3.2 Gender-based Violence GBV Grievance mechanism ............................... 52 5
- 6.4 MONITORING AND REPORTING ................................................................... 53 5
- Annex 1 Consultations Minutes and Attendance .......................................................... 54 5
- Annex 2 Grievance Form .............................................................................................. 46 5
- Annex 3 Grievance Log ................................................................................................. 47 5
- LIST OF TABLES 6
- Table 2.1- Public Consultation of Previous ESIAs processes ........................................... 11 6
- Table 2-2- Summary of the consultation activities that were conducted in project area ... 18 6
- Table 3-1- Detailed list of stakeholders ............................................................................. 20 6
- Table 4-1-Component 1 Disclosure Activities .................................................................. 32 6
- Table 4-2- Component 2 Disclosure Activities ................................................................. 36 6
- Table 4-3- Component 1 strategy for consultation ............................................................ 42 6
- Table 4-4- Component 2 strategy for consultation ............................................................ 43 6
- LIST OF FIGURE 7
- Figure 1-1- The train track is in agricultural land far from urban areas .............................. 4 7
- Figure 1-2- Alexandria Arab El Raml 165 Km Railway Line .......................................... 5 7
- Figure 1-3- Banha Cairo 45 km Railway Line .................................................................. 6 7
- Figure 1-4- Cairo - Giza Beni Suef 120 km Railway Line ............................................... 7 7
- Figure 1-5- Beni Suef Assuit 250 Railway km Line......................................................... 8 7
- Figure 1-6- Asyut Nag Hammadi 180 km Railway Line .................................................. 9 7
- ACRONYMS 8
- Abbreviation Abbreviation Full wording 8
- CSOs 8
- CTC 8
- ENR 8
- ESF 8
- ESIA 8
- ESS 8
- FGDs 8
- MoT 8
- NGOs 8
- PAPs 8
- PMU 8
- SDO 8
- SEP 8
- 1 INTRODUCTION 9
- 1.1 Project Description 9
- Works planned for the modernization of signaling and upgrading of tracks include 9
- 1.2 Project Site Location 10
- Figure 1-1- The train track is in agricultural land far from urban areas 11
- Figure 1-2- Alexandria Arab El Raml 165 Km Railway Line 12
- Segment 1 Alexandria - Arab Elraml 12
- Figure 1-3- Banha Cairo 45 km Railway Line 13
- Segment 2 Cairo - Benha 13
- Figure 1-4- Cairo - Giza Beni Suef 120 km Railway Line 14
- Segment 3 Cairo Beni Suef 14
- Figure 1-5- Beni Suef Assuit 250 Railway km Line 15
- Segment 4 Beni Suef - Assiut 15
- Figure 1-6- Asyut Nag Hammadi 180 km Railway Line 16
- Segment 5 Assiut - Nag Hammadi 16
- 2 SUMMARY OF PREVIOUS STAKEHOLDERS ENGAGEMENT ACTIVITIES 17
- Public Consultations as part of previous ESIA processes 17
- 2.2 Stakeholder engagement with PAPs on land issues 21
- 2.3 Community Outreach by Contractors 22
- 2.4 Lessons learned from ENRRP 22
- 2.5 Consultations as Part of Project Preparation OCT-NOV 2020 24
- RISE 24
- Scoping Consultation Activities 24
- Error Reference s ource not found. 24
- Public Consultation Session 24
- Distribution of participants according to their affiliation Number Percentage 25
- Total 25
- Error Reference source not found. 25
- 3 STAKEHOLDER IDENTIFICATION AND ANALYSIS 26
- 4 STAKEHOLDER ENGAGEMENT PROGRAM 36
- 4.1 Purpose and timing of stakeholder engagement program 36
- 4.2 Proposed strategy for information disclosure 36
- 4.3 Proposed strategy for consultation 47
- 4.4 Proposed strategy to incorporate the view of vulnerable groups 51
- 4.5 Timelines 51
- 4.6 Review of Comments 52
- 5 RESOURCES AND RESPONSIBILITIES FOR IMPLEMENTING STAKEHOLDER ENGAGEMENT ACTIVITIES 53
- 5.1 Resources 53
- 5.2 Management functions and responsibilities 53
- 6 GRIEVANCE MECHANISM GM 54
- 6.1 The project GM 54
- 6.2 Grievance Cycle 54
- Tier 1 55
- Tier 2 Tier 3 55
- 6.3 Current GM Central Institution level utilized by ENR 57
- 6.4 MONITORING AND REPORTING 58
- Annex 1 Consultations Minutes and Attendance 59
- Key comments and concerns raised during the scoping consultations activities 59
- Key questions and comments raised during the public consultation session 60
- The attendance sheet has been removed as it contains personal data of the participants and the personal information is kept in the internal version. 66