Authors
- Disclosure Date
- 2024/10/21
- Disclosure Status
- Disclosed
- Doc Name
- P506602 - Draft Environmental and Social Systems Assessment (ESSA) - Low Carbon City Program
- Lending Instrument
- Program-for-Results
- Pages
- 107
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- CN-Low Carbon City Program-P506602
- TF No/Name
- TF0C5174-T1 - China, Shijiazhuang- Low Carbon Urban Development in Shijiazhuang-
- Unit Owning
- INF-EAP-Urban 2 (IEAU2)
- Version Type
- Final
Files
Table of Contents
- Contents 2
- Abbreviations and Acronyms 4
- 1. Introduction 5
- 1.1 Objectives and Tasks of the ESSA 5
- 1.2 Procedures and Methodologies of the ESSA 5
- 2. Program Description 7
- 2.1 Program Background 7
- 2.2 Government Program 7
- 2.3 The PforR Scope 8
- 2.4 Institutional arrangement and experience 10
- 3. ES Impact and Risk Assessment 12
- 3.1 ES Exclusion 12
- 3.2 Potential ES Impacts 13
- 3.2.1 ES Benefits 13
- 3.2.2 Adverse ES Impacts 13
- 3.2.3 Cumulative ES Impacts 17
- 3.3 ES Risk Rating 17
- 3.3.1 Potential ES impacts 18
- 3.3.2 ES contextual risks 18
- 3.3.3 Institutional capacity and complexity risks 18
- 3.3.4 Political and reputational risks 19
- 4. Environmental Management System Assessment 20
- 4.1 General Principles 20
- 4.2 EIA and Follow-up Management System 21
- 4.3 Pollution Control System 27
- 4.3.1 Management of construction dust noise and solid waste 27
- 4.3.2 Soil pollution management on construction land 31
- 4.3.3 Prevention and control of other pollutions 35
- 4.4 Ecological Protection System and Cultural Relics Protection System 38
- 4.4.1 Ecological protection system 38
- 4.4.2 Cultural relics protection system 39
- 4.5 Health and Safety Management System 40
- 4.6 Consistency with the WBs Core Principles 44
- 5. Social Management System Assessment 46
- 5.1 General Principle 46
- 5.2 Sustainable social risk management 47
- 5.3 Land use and involuntary resettlement 52
- 5.4 Labor Rights and Protection 60
- 5.5 Information Disclosure and Public participation 63
- 6. Stakeholder Engagement and Grievance Redress Mechanisms 68
- 6.1 Stakeholder Engagement 68
- 6.1.1 Initial Engagement Activities 68
- 6.1.2 Public Consultation on the ESSA Report 68
- 6.2 Grievance Redress Mechanisms 69
- 7. Conclusions Recommendations and Action Plans 70
- 7.1 Conclusions 70
- 7.2 Recommendations 71
- 7.3 Program Action Plan 71
- 8. Implementation Arragement and Monitoring 74
- 8.1 The Borrower 74
- 8.2 The World Bank 74
- Appendix 1 Boundary of Government Programs and the PforR 76
- Appendix 2 Assessment of ES RisksImpacts of the PforR Activities 79
- Appendix 3 Comparison with the Bank PforR Policy and Directive 82
- Appendix 4 Stakeholder Identification and Analysis 93
- Appendix 5 Stakeholder Engagement Activities 95
- Appendix 6 Feedback from Draft ESSA Consultation 96
- Appendix 7 Field Visit Records 99
- Appendix 8 Generic ES Mitigation Measures 102
- Appendix 9 Record of Community Leaders and Villagers Dialogue with the Project 106