Authors
- Disclosure Date
- 2024/10/28
- Disclosure Status
- Disclosed
- Doc Name
- Cambodia - EAST ASIA AND PACIFIC- P150572- KH - Road Asset Management Project II - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Originating Unit
- INF-EAP-Transport (IEAT1)
- Pages
- 8
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- KH-- Road Asset Management Project II -- P150572
- Unit Owning
- INF-EAP-Transport (IEAT1)
- Version Type
- Final
Table of Contents
- July 9 2010 1
- Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP 1
- I. General 1
- 1. Banks approval Date of the procurement Plan June 6 2016 1
- 2. Date of General Procurement Notice June 06 2016 1
- 3. Period covered by this procurement plan The procurement period of project covered from year June 2016 to January 2018 1
- 2. Prequalification . Bidders for Not applicable shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 1
- 3. Proposed Procedures for CDD Components as per paragraph. 3.17 of the Guidelines Not applicable 1
- July 9 2010 2
- 4. Reference to if any Project OperationalProcurement Manual Project Implementation Manual for World Bank Loan Project issued on June 2016 by MPWT RAMP II PMU 2
- 5. Any Other Special Procurement Arrangements Not applicable 2
- 6. including those that are subject to retroactive financing and advanced procurement 2
- List the Packages which require Banks prior review first and then the other packages 2
- 54.1 4 No Prior 2
- 0.63 1 No Post 2
- No No No No 2
- 0.155 4 No Post 2
- No No No No 2
- 1. Prior Review Threshold Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants 2
- July 9 2010 3
- 3. Any Other Special Selection Arrangements including advance procurement and retroactive financing if applicable or delete if not applicable 3
- 4. Consultancy Assignments with Selection Methods and Time Schedule 3
- US million 3
- Summary of number of contracts that will be let under QCBS 3
- 4.3 1 Prior 3
- Summary of number of contracts that will be let under QCBS 3
- 0.3 1 Post 3
- Summary of number of contracts that will be let under CQS methods 3
- 0.03 1 Prior 3
- Summary of number of contracts 3
- 0.24 2 Prior 3
- July 9 2010 4
- 0.094 4 Post 4