Authors
- Disclosure Date
- 2024/10/28
- Disclosure Status
- Disclosed
- Doc Name
- Environmental and Social Management Plan (ESMP) Skills for A Vibrant Economy Project (P172627)
- Lending Instrument
- Investment Project Financing
- Pages
- 121
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- MW-Skills For A Vibrant Economy Project -- P172627
- TF No/Name
- TF0C2099-Building Resilient Hybrid Skills Development for Youth
- Unit Owning
- Education AFR 1 (HAEE1)
- Version Type
- Final
Table of Contents
- ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN FOR 1
- CONSTRUCTION AND OPERATION OF INTEGRATED TEACHING FACILITY UNDER SKILLS FOR A VIBRANT 1
- ECONOMY PROJECT 1
- PROJECT IMPLEMENTING AGENCY 1
- Vice Chancellor 1
- Kamuzu University of Health Sciences-Blantyre Campus 1
- Private Bag 360 1
- Blantyre 1
- Executive Summary 2
- Noise and other activities from the construction site might disrupt the teaching and learning activities. 4
- There is a risk of fire accidents when the building is operated. 5
- Construction of the new facility will likely increase the traffic flow to the college hence leading to traffic management issues. 5
- The operation of the dental school will likely use chemicals which will require special handling procedures as specified in the material safety data sheets MSDS 5
- Wastewater from the unit containing biological agents and chemicals can contaminate water sources and spreading diseases. 5
- Table of Contents 6
- List of Tables 9
- List of Figures 9
- List of Acronyms and abbreviation 10
- Chapter One Introduction 12
- Chapter Two Project Description 14
- Chapter Three Legal Framework 20
- The proposed work has identified ES risks and impacts based on consultations with stakeholders. This ESMP has also been prepared in line with the standard 26
- Chapter Four Environmental and Social Setting 30
- Direct Impact Areas 30
- Indirect Impact Areas 30
- Cumulative Impact Areas 30
- Chapter Five Assessment of Environmental and Social Impacts 35
- Total Training Program 68
- Annex 1 Location Maps 70
- Annex 3 Project Impacts and their Ratings 84
- Annex 4 Stakeholder Consultations 89
- Annex 5 Evidence of Public Consultations 100
- Annex 6 GBV SEA and SH Management Plan 106
- Annex 7 Code of Conduct for Contractor in Relation to Child Protection 108
- Annex 8 Guide for Developing an Infection Control Plan 109
- Annex 9 Life and Fire Safety Plan 112
- Annex 10 Traffic Management Plan 114
- Annex 11 Covid-19 Construction Site Prevention Guidelines 117
- Annex 12 Chance Find Procedures for SAVE Project 119