- 2024/11/14
- Disclosure Status
- Disclosed
- Doc Name
- Disclosable Version of the ISR - Yangtze River Protection and Ecological Restoration Program - P171644 - Sequence No : 7
- Lending Instrument
- Program-for-Results
- Pages
- 17
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- CN-Yangtze River Protection And Ecological Restoration Program -- P171644
- Unit Owning
- Water East Asia & Pacific Region (SEAW1)
- Version Type
- Final
Table of Contents
- The World Bank 1
- 1. PROJECT DEVELOPMENT OBJECTIVE 1
- 1.1 Development Objective 1
- 2. OVERALL RATINGS 1
- 3. KEY ISSUES STATUS 1
- 3.1 Implementation Status and Key Decisions 1
- The World Bank 2
- The next Bank implementation support mission is scheduled for April 2025. 2
- 4. DATA ON FINANCIAL PERFORMANCE 2
- 4.1 Disbursements by loan 2
- 4.2 Key Dates by loan 2
- 4.3 Program Action Plan 2
- The World Bank 3
- The World Bank 4
- The World Bank 5
- 5. KEY DATES 5
- 6. SYSTEMATIC OPERATIONS RISK-RATING TOOL 5
- The World Bank 6
- The World Bank 7
- 7. RESULTS 7
- 7.1 PDO Indicators by PDO Outcomes 7
- The World Bank 8
- The World Bank 9
- 7.2 Intermediate Results Indicators by Results Areas 9
- The World Bank 10
- The World Bank 11
- The World Bank 12
- The World Bank 13
- 7.3 Disbursement Linked Indicators DLI 13
- The World Bank 14
- The World Bank 15
- The World Bank 16
- The World Bank 17