Authors
Related Organizations
- Disclosure Date
- 2024/11/13
- Disclosure Status
- Disclosed
- Doc Name
- Environmental and Social Impact Assessment Tanzania Transport Integration Project (P165660)
- Lending Instrument
- Investment Project Financing
- Pages
- 581
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- TZ-Tanzania Transport Integration Project -- P165660
- TF No/Name
- TF0A7689-AFRICA CLIMATE RESILIENCE INVESTMENT FACILITY,TF0A7714-INTERNATIONAL ROAD ASSESSMENT PROGRAM FOR BLOOMBERG INITIATIVE FOR GLOB,TF0B7336-Tanzania National Roads Agency (TANROADS) Environmental and Social Fram
- Unit Owning
- Transport-East Africa (IAET1)
- Version Type
- Final
Table of Contents
- Environmental screening Impact Indigenous PeoplesSub-Saharan African Historically Underserved Traditional Local 20
- Communities Indirect impacts Key stakeholders Mitigation measures Natural areas Participation Periodic maintenance Project affected people 20
- Routes 62
- The following figure 2.1 indicates the proposed project Iringa region 69
- NOTE The new construction of runway taxiway and apron is 100 completed as per design under LOT-1 but not operational. 88
- Construction of Access road with 300m under LOT- 1 has been undertaken and is at 98 completion. NOTE The remaining section of 1200m of access roads 89
- NOTE This component shall be Constructed in LOT-2 under WB financing. 91
- NOTE The new Terminal Building as per design shall be constructed in LOT- 2 Under World Bank financing. 92
- NOTE The new power line with 415Kw has been installed in LOT- 1 and has been completed over 100 95
- The new water pipeline from IRUWASA to produce 30000lts a day at the airport and 2-lifted Tanks for 95
- NOTE The airport design does not include this component 97
- NOTE The sewage system and related facilities 97
- NOTE The waste management facilities shall be Constructed in LOT -2 under WB financing. 99
- NOTE 100
- NOTE 101
- Routes 235
- Among others during this project phase the Contractor shall undertake the following mitigations 361