cover image: GSAS 2019 D&B Assessment Manual for Parks

20.500.12592/cztkvf

GSAS 2019 D&B Assessment Manual for Parks

14 Jul 2020

The assessment considers the connections to planned infrastructures on the condition that the infrastructures are to be made available within 5 years from the completion of the park based on the evidence obtained from the infrastructure providers. [...] 2.1.3 ASSESSMENT The criterion requires assessing the existing ecological value of the site by quantifying the pre- and post-development conditions of the areas of the land based on the geological and environmental testing and assessment report. [...] The geological testing includes the investigations of the surface and subsurface soil stratification along with the geological conditions and the physical and mechanical properties of the ground materials. [...] The plan includes identifying the types and number of plants and endangered animals and the potential of the park to damage the interaction of the ecosystem with the site and surrounding areas. [...] • Full compliance for this criterion is associated with the plan establishes the inventory of the plants and endangered animals, assesses the potential impacts of the park to the ecosystem, and describes the post-development conservation, restoration, or enhancement strategies of the site’s biodiversity.
Pages
200
Published in
Qatar