cover image: WASTE MANAGEMENT BEST PRACTICES FOR CONSTRUCTION SITES - Case Studies from FIFA World Cup Qatar 2022™ Stadiums

20.500.12592/gr68zj

WASTE MANAGEMENT BEST PRACTICES FOR CONSTRUCTION SITES - Case Studies from FIFA World Cup Qatar 2022™ Stadiums

15 Apr 2021

Construction Phase • Determining the procedures to collect, segregate and store the waste, During the construction phase the contractor is in charge of deploying in conjunction with the construction management and logistics the resources to execute and supervise the implementation of waste departments. [...] The size to segregate the waste across the site and transport it to the waste storage of the site, space constraints, substantial number of workers and the lack of areas. [...] The Disposal Waste Transfer Note should include at least the waste to the designated recycling facility, and not dumping the waste the name of the project, name of the waste hauler, name of the recycling elsewhere. [...] The ticket with the weight of the waste issued by the weighing equipment was attached to the Waste Transfer Note issued by the waste hauler. [...] For food and hazardous waste, the skips should also be equipped with close-fitting In principle, the waste hauler has the responsibility of collecting the lids to prevent the escape of any of their contents and prevent the waste from the construction site, transporting it and disposing it at the offensive odors.
Pages
48
Published in
Qatar