Authors
- Disclosure Date
- 2024/11/15
- Disclosure Status
- Disclosed
- Doc Name
- Concept Program Information Document (PID)
- Lending Instrument
- Program-for-Results
- Pages
- 11
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- NP-Third Bridges Improvement And Maintenance Program -- P507516
- Unit Owning
- Transport-SAR (ISAT1)
- Version Type
- Final
Files
Table of Contents
- The World Bank 1
- The World Bank 2
- BASIC INFORMATION 2
- A. Basic Program Data 2
- Proposed Program Development Objectives 2
- COST FINANCING US Millions 2
- Maximizing Finance for Development 2
- Is this an MFD-Enabling Project MFD-EP 2
- Is this project Private Capital Enabling PCE 2
- SUMMARY 2
- Government program Cost 150.00 2
- Total Operation Cost 150.00 2
- Total Financing 150.00 2
- Financing Gap 0.00 2
- FINANCING 2
- The World Bank 3
- Total World Bank Group Financing 150.00 3
- B. Introduction and Context 3
- Nepal has made important strides on its economic reform agenda. 3
- Real GDP growth is expected to recover modestly. 3
- The economic outlook faces several downside risks. 3
- Nepals political system is democratic with a coalition-based government 3
- The World Bank 4
- Nepal faces significant vulnerability to natural hazards and climate change impacts. 4
- Road transport accounts for the movement of 90 percent of passengers and goods in landlocked Nepal 4
- Road and bridge infrastructure plays a major role in Nepals economic growth productivity and resilience 4
- The road transport sector is guided by the latest National Transport Strategy 2007 the 10-year Priority 4
- Investment Plan 2016 and the National Planning Commissions Sixteenth Five-Year Periodic Plan FY202425 FY202829. 4
- The Department of Roads DoR under the Ministry of Physical Infrastructure and Transport MoPIT is the 4
- The World Bank 5
- The SRN and its bridges are vulnerable to climate change hazards and seismic events 5
- The proposed operation will build on DoRs achievements under previous partnerships with the WB 5
- The proposed operation is consistent with the countrys long-term goal 5
- The World Bank 6
- Nepals bridge investment program has provided critical support to improve the condition road safety and 6
- Enhancing the efficiency of DoR while using a results-oriented approach 6
- C. Program Development Objectives PDO and PDO Level Results Indicators 6
- Results Area 1 Promoting resilient and inclusive connectivity. 6
- Results Area 2 Enhancing safety of bridges. 6
- The World Bank 7
- Results Area 3 Strengthening organizational and technical capacities. 7
- D. Program Description 7
- The PforR Program boundary includes 7
- Table 1. PforR Program Boundary 7
- The World Bank 8
- The PforR program will exclude any activities which are likely to have 8
- DoR shall ensure that the Program excludes the procurement of 8
- The IPF component will support 8
- E. Initial Environmental and Social Screening 8
- PforR Component 8
- The World Bank 9
- Policies Triggered 9
- IPF Component 9
- The World Bank 10
- SEASH Moderate 10
- CONTACT POINT 10
- The World Bank 11
- World Bank 11
- BorrowerClientRecipient 11
- Ministry of Finance 11
- Implementing Agencies 11
- Ministry of Physical Infrastructure and Transport 11
- FOR MORE INFORMATION CONTACT 11