Due to the change in the technical scope of the road investments (the Huong Thuong-Chua Hang and Bac Nam roads), the end target will be proposed to be adjusted to Comments: 36,050 through restructuring. [...] The revision of the technical design of the Huong Thuong-Chua Hang and Bac Nam roads and delay in the completion of Comments: other roads and bridges will push back the achievement of this target to Year 4, to be reflected in the proposed restructuring. [...] Due to the change in the technical scope of the road investments Comments: (the Huong Thuong-Chua Hang and Bac Nam roads), the end target is proposed to be adjusted to 42,150. [...] Due to the change in the technical scope of the road investments (the Huong Thuong-Chua Comments: Hang and Bac Nam roads), the end target is proposed to be adjusted to 79,495. [...] Due to the adjustment of the technical design of roads and bridges, the end target is proposed to change to 13.75.
Authors
- Disclosure Status
- Disclosed
- Doc Name
- Disclosable Version of the ISR - Dynamic City Integrated Development Project - Thai Nguyen - P160162 - Sequence No : 08
- Published in
- United States of America
- Rel Proj ID
- VN-Dynamic City Integrated Development Project - Thai Nguyen -- P160162
- Unit Owning
- Urban EAP 2 (SEAU2)
- Version Type
- Buff cover