cover image: Carbon Reduction Plan FY22/23 - Interim Report - unsigned

20.500.12592/k8g287

Carbon Reduction Plan FY22/23 - Interim Report - unsigned

13 Oct 2023

Total = 0 tCO2e Scope 2 To calculate its Scope 2 emissions, BIT has taken the total electricity usage figures from its office in London and added an estimate of the energy usage for staff in its office in Manchester, which has a number of workstations within a serviced office. [...] Business Travel = 290.687tCO2e Waste generated in operations: BIT has estimated the emissions incurred from the waste generated in its offices in London and Manchester using the GHG Protocol Tool. [...] Total = 0 tCO2e Scope 2 To calculate its Scope 2 emissions, BIT has taken the total electricity usage figures from its office in London (NB we have moved office locations this FY) and added an estimate of the energy usage for staff in its office in Manchester, which has a number of workstations within a serviced office. [...] Total = 0 tCO2e Scope 2 To calculate its Scope 2 emissions, BIT has taken the total electricity usage figures from its office in London and added an estimate of the energy usage for staff in its office in Manchester, which has a number of workstations within a serviced office. [...] Business Travel = 14.57 tCO2e Waste generated in operations: BIT has estimated the emissions incurred from the waste generated in its offices in London and Manchester using the GHG Protocol Tool.
Pages
8
Published in
United Kingdom

Tables