TCH0000C0001-0000-GN-SOW-0001_A
Authors
- Pages
- 35
- Published in
- Australia
Table of Contents
- 1. Introduction 7
- 1.1 Project Introduction 7
- 1.2 Process Description 7
- 1.3 Separable Portions 9
- 1.4 Description of the Works 9
- 1.5 Interpretation 9
- 2. Definitions and Abbreviations 10
- 2.1 Definitions 10
- 2.2 Abbreviations 10
- 3. Site Location and Access 11
- 3.1 West Erez 11
- 3.2 Karni 12
- 3.3 Kerem Shalom 13
- 4. Preliminaries 14
- 4.1 Project Documentation 14
- 4.2 Management, Supervision and Labour 14
- 4.3 Transport 14
- 4.4 Survey 14
- 4.5 Site Establishment 15
- 4.5.1 Working Hours 15
- 4.5.2 Contractor Site Facilities Establishment 15
- 4.5.3 Site First Aid Equipment/Requirements 15
- 4.6 Construction Power 15
- 4.7 Construction Communication 16
- 4.8 Temporary Facilities 16
- 4.9 Concrete Supply 16
- 4.10 Waste Management 16
- 5. Scope of Work 17
- 5.1 Overview 17
- 5.2 Key Dates 17
- 5.3 Design Basis 17
- 5.4 Scope Requirements (Israel) 19
- 5.4.1 Earthworks 19
- 5.4.2 Security Barrier(s) (Existing) 20
- 5.4.3 Security Barrier – Hesco (New) 20
- 5.4.4 Security Fencing (New) 21
- 5.4.5 Automatic & Manual Vehicle Gates 21
- 5.4.6 Security Pedestrian Gates / Turnstiles 21
- 5.4.7 Logistics and Security Hub (Zone 1) 22
- 5.4.8 Back-up Diesel Generator & Fuel Storage (Israel) 22
- 5.4.9 Electrical Power Connection to Grid 23
- 5.4.10 Lighting (Israel) 24
- 5.5 Scope Requirements (Gaza) 24
- 5.5.1 Earthworks 25
- 5.5.2 Blast Barriers – Outbound Non-Compliance Inspection Area 25
- 5.5.3 Security Pedestrian Gate (Gaza) 26
- 5.5.4 Security Station and Ablutions (Gaza – Zone 4) 26
- 5.5.5 Secondary Security Scanning Station and Dog Kennel (Gaza – Zone 5) 26
- 5.5.6 Lighting (Gaza) 27
- 5.6 Principal Supplied Assets 27
- 6. Testing and Commissioning 28
- 7. Works Excluded 28
- 8. Demobilisation 29
- 9. Battery Limits 29
- 10. Quality 29
- 10.1 Technical Query 29
- 10.2 Inspection Test Plan 29
- 10.3 Quality of Workmanship 30
- 10.4 Quality of Materials and Products 30
- 11. Codes and Standards 30
- 11.1 Statutory Requirements 30
- 11.2 Israeli Codes, Standards and Guidelines 31
- 12. Project Management and services 33
- 12.1 Project Management (Optional Scope) 33
- 12.1.1 Construction Management Plan 33
- 12.1.2 Organisation and Key Personnel 33
- 12.1.3 Project Scopes of Work 33
- 12.1.3.1 SOW-0001: Trailer Swap Facility – Infrastructure (this SOW) 33
- 12.1.3.2 SOW-0002: Trailer Swap Facility - Security System Development (by others) 33
- 12.1.3.3 SOW-0002: Vehicle - Security System Development (by others) 34