- Doc Name
- Environmental and Social Management Plan (ESMP) Program on Sustainable Fishery Development in Red Sea and Gulf of Aden (SFISH) (P178143)
- Pages
- 104
- Published in
- United States of America
- Rel Proj ID
- 5M-Program On Sustainable Fishery Development In Red Sea And Gulf -- P178143
- TF No/Name
- TF0B9721-1.2.-EG-Climate Change Impacts and Adaptive Planning Priorities of Capt,TF0C0545-G200 1.2.-YM-DJ-Support to Sustainable Fishery Management in the Red Se
- Unit Owning
- MNA ENR PM (SMNEN)
- Version Type
- Final
Files
Table of Contents
- Table of Contents 2
- 1 Introduction ............................................................................................................................... 6 2
- 2 Project Description .................................................................................................................... 8 2
- 3 Environmental and Social Baseline conditions ....................................................................... 14 2
- 4 Environmental and Social Impacts Assessment ..................................................................... 23 2
- 5 Environmental and Social Impact Analysis Plan and Mitigation Measures ............................ 32 2
- 6 Environmental Social and OHS Clauses and Liabilities for Contractors ............................... 71 3
- 7 Environmental and Social Monitoring Plan ............................................................................. 76 3
- 8 Stakeholders Engagement Plan Public Consultation .............................................................. 87 3
- 9 Grievance Mechanism ............................................................................................................. 92 3
- Annexes ........................................................................................................................................... 93 3
- List of tables 3
- List of figures 4
- Abbreviations 5
- 2.1 Scope of Work 9
- 2.2 Location 11
- 3 Environmental and Social Baseline conditions 14
- 3.1 Introduction 14
- 3.2 Physical Environment 15
- 3.2.1 Rainfall Climate and Weather 15
- 3.2.2 Hydrology 16
- 3.2.3 Soil and Geology 17
- 3.2.4 Cultural Heritage 18
- 3.2.5 Air Quality and Noise 18
- 3.3 Biotic Environment 18
- 3.3.1 Flora and Fauna 18
- 3.4 Socio-Economic Conditions 20
- 3.5 Existing situation of the subproject site 20
- 3.6 Targeted Beneficiaries 22
- 4 Environmental and Social Impacts Assessment 23
- 4.1 Applicability 23
- 4.2 Eligibility Exclusion List 24
- 4.3 Environmental and Social Screening 24
- 4.4 Potential Environmental Impacts 24
- 4.4.1 Potential Environmental Impacts during Construction Phase 24
- 4.4.2 Potential Environmental Impacts during the Operational Phase 26
- 4.5 Potential Socio-economic Impacts 27
- 4.5.1 Socio-economic Impacts during Construction Phase 27
- 4.5.2 Gender and Social Related Issues 30
- 4.5.3 Socio-economic Impacts during Operational Phase 31
- 4.5.4 Conflict sensitivity and Do No Harm 32
- 5 Environmental and Social Impact Analysis Plan and Mitigation Measures 32
- 5.1 Environmental and Social Management Plan 34
- 5.2 Occupational and Health Safety Plan 49
- 6 Environmental Social and OHS Clauses and Liabilities for Contractors 71
- 6.1 Conditions for the Eligible Contractors 71
- 6.2 Environmental and Social Clauses for Contractors 71
- 6.3 Environmental and Social Liabilities for Contractors 74
- 6.4 Public Works Project Liabilities 75
- 7 Environmental and Social Monitoring Plan 76
- Gender Focal Point Resident Engineer Community Committee 82
- When happen 82
- 8 Stakeholders Engagement Plan Public Consultation 87
- 8.1 Public Consultation 87
- 8.2 Public Consultation Findings and Feedback 88
- Summary of Consultation for Rowkub fish landing site subproject 89
- Main issuesidentified 89
- Answers from the project team 89
- Follow-up actions 89
- 8.3 Sustainability of Subproject and Community Ownership 90
- 8.4 Stakeholders Engagement Plan 90
- 8.5 Information Dissemination and disclosure 91
- 8.6 Capacity Building 91
- 9 Grievance Mechanism 92
- Annexes 93
- Annex 1- Typical Drawings 93
- Annex 2 Environmental and Social Screening Checklist 97
- 07-09-16078 97
- Annex 3 - PWP Environmental and Social Responsiveness ESR Criteria at Proposal Stage 100
- Annex 4 - PWP Checklist of Expected Environmental and Social Impacts to be Addressed 101
- Annex 5 - Social agreements and A land document for the benefit of fisheries - Arabic 102
- Annex 6 PWP Complain Handling Mechanism 103