Authors
- Disclosure Date
- 2024/10/07
- Disclosure Status
- Disclosed
- Doc Name
- Disclosable Version of the ISR - Second District Heating Efficiency Improvement Project - P172668 - Sequence No : 7
- Lending Instrument
- Investment Project Financing
- Originating Unit
- IECE1 - Infra ECA Energy 1
- Pages
- 7
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- MD-Second District Heating Efficiency Improvement Project -- P172668
- TF No/Name
- TF0B3123-Support and capacity building to design Life-cycle Cost Criteria in Mol,TF0B9095-Moldova: Supporting Energy Efficiency and Sustainable Renewables,TF0C3332-WeBaPlus- Moldova -Sustainable Heating
- Unit Owning
- Infra ECA Energy (IECEE)
- Version Type
- Final
Table of Contents
- The World Bank 1
- 1. OBJECTIVE 1
- 1.1 Development Objective 1
- 2. COMPONENTS 1
- 3. OVERALL RATINGS 1
- 4. KEY ISSUES STATUS 1
- 4.1 Implementation Status and Key Decisions 1
- The World Bank 2
- 5. SYSTEMATIC OPERATIONS RISK-RATING TOOL 2
- The World Bank 3
- 6. RESULTS 3
- 6.1 PDO Indicators by PDO Outcomes 3
- 6.2 Intermediate Results Indicators by Components 3
- Not Categorized 3
- The World Bank 4
- The World Bank 5
- The World Bank 6
- 7. DATA ON FINANCIAL PERFORMANCE 6
- 7.1 Cumulative Disbursements 6
- 7.2 Disbursements by loan 6
- 7.3 Key Dates by loan 6
- 8. KEY DATES 6
- The World Bank 7
- 9. RESTRUCTURING HISTORY 7
- 10. ASSOCIATED OPERATIONS 7