Authors
- Disclosure Date
- 2024/10/17
- Disclosure Status
- Disclosed
- Doc Name
- Indonesia - EAST ASIA AND PACIFIC- P170874- Indonesia Disaster Resilience Initiatives Project (IDRIP) - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Pages
- 13
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- ID-Indonesia Disaster Resilience Initiatives Project (Idrip) -- P170874
- TF No/Name
- TF0A9731-Technical Assistance: Supporting recovery and strengthening resilience
- Unit Owning
- INF-EAP-Urban 1 (IEAU1)
- Version Type
- Final
Table of Contents
- CENTRAL SULAWESI REHABILITATION AND RECONSTRUCTION PROJECT CSRRP 1
- LOAN No. IBRD Ln.8979 AIIB LN 004-IDN 1
- Summary of Procurement Plan 1
- I. General Information 1
- 1. Project information 1
- 2. Banks No Objection Date of the Procurement Plan 1
- 3. Date of General Procurement Notice 1
- 4. Period covered by this procurement plan 31 December 2024 1
- II. Types of Contract Banks Review Requirements and Applied Methods 1
- Works Goods and Non-Consulting Services 1
- 1. Prior Review Threshold 1
- Ref. No. Procurement Method Procureme nt Method Threshold 1
- Banks Review Requirement 1
- 1. Pre-qualification 3
- 2. Proposed Procedures for CDD Components as per paragraph. 3.17 of the Guidelines 3
- 3. Reference to if any Project OperationalProcurement Manual 3
- 4. Any Other Special Procurement Arrangements 3
- 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 3
- 1 2 3 4 5 6 7 4
- Ref. No. 4
- Descripti on 4
- Estimat ed 4
- Cost US million 4
- Packag es 4
- Domesti c Prefere nce 4
- Revie w by Bank Prior Post 4
- Comments 4
- Selection of Consultants 4
- 1. Prior Review Threshold 4
- Ref. No. 4
- Selection Method 4
- Selection Method Threshold 4
- Banks Prior Review Requirement 4
- Ref. No. 5
- Selection Method 5
- Selection Method Threshold 5
- Banks Prior Review Requirement 5
- 2. Short list comprising entirely of national consultants 5
- 3. Any Other Special Selection Arrangements 5
- 4. Summary of Consultancy Assignments with Selection Methods and Time Schedule during the first 18 months after project effectiveness 5
- 1 2 3 4 5 6 7 5
- Ref . No. 5
- Descripti on of Assignme nts 5
- Type of Assignme nts 5
- Estimat ed 5
- Cost US million 5
- Packag esPosit ions 5
- Revie w by Bank Prior Post 5
- Commen ts 5
- 1 2 3 4 5 6 7 6
- Ref . No. 6
- Descripti on of Assignme nts 6
- Type of Assignme nts 6
- Estimat ed Cost US million 6
- Packag esPosit ions 6
- Revie w by Bank Prior Post 6
- Commen ts 6