Authors
- Disclosure Date
- 2024/10/28
- Disclosure Status
- Disclosed
- Doc Name
- Ethiopia - EASTERN AND SOUTHERN AFRICA- P176731- Power Sector Reform, Investment and Modernization in Ethiopia (PRIME-1) - Procurement Plan
- Lending Instrument
- Investment Project Financing
- Originating Unit
- Infra AFR Energy 1 (IAEE1)
- Pages
- 69
- Product Line
- IBRD/IDA
- Published in
- United States of America
- Rel Proj ID
- ET-Power Sector Reform, Investment And Modernization In Ethiopia ( -- P176731
- TF No/Name
- TF0B6733-KGGTF Grid Integration of Variable Renewable Energy in Ethiopia,TF0C2969-Ethiopia - Power Sector Reform, Investment and Modernization in Ethiopi
- Unit Owning
- Infra AFR Energy 1 (IAEE1)
- Version Type
- Final
Table of Contents
- FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA 1
- POWER SECTOR REFORM INVESTMENT AND MODERNIZATION IN ETHIOPIA PRIME-1 1
- P176731 1
- PROJECT PROCUREMENT STRATEGY FOR DEVELOPMENT PPSD 1
- ETHIOPIAN ELECTRIC UTILITY 2
- EEU 2
- PROJECT PROCUREMENT STRATEGY FOR DEVELOPMENT 2
- PPSD 2
- December 2023 2
- Table of Contents 3
- . Project Overview 4
- 1.1.Project Description 4
- 1.2. Project Development Objectives 4
- 1.3. PDO Level Results Indicators 4
- 1.4. Project Components 5
- 2. Strategic Assessment of Operating Context and Borrower Capability 6
- Strength Weakness 10
- Opportunities Threats 10
- Estimated Cost Low Estimated Cost High 15
- Risk or Vulnerabili ty High 15
- Strategic Security 15
- Strategic Critical 15
- Risk or Vulnerability High 15
- Estimated Cost Low Estimated Cost High 16
- Risk or Vulnerabili ty Low 16
- Tactical Acquisition 16
- Tactical Advantage 16
- Risk or Vulnerability Low 16
- Low Estimated to Cost Value Low Estimated to Cost Value High High 16
- 3.Procurement Risk Analysis 19
- Most of Procurement risk rating is Substantial. 19
- 5. Recommended Procurement ArrangementApproach for the Project 22
- 7. Summary of PPSD to Support the Preparation of the PAD by the Bank 31
- P R T 31
- Annex 1 PPSD Annexes 32
- Annex 2 Procurement Plan 32
- ETHIOPIAN ELECTRIC POWER EEP 33
- PROJECT PROCUREMENT STRATEGY FOR DEVELOPMENT 33
- PPSD 33
- Decemebr 2023 33
- Table of Contents 34
- List of Tables 34
- 1. Program Overview 35
- Outcome Indicators 36
- 1 Component-2 Transmission Network Strengthening and 36
- Modernization IDA US 281M 36
- Sub-Component-2d Support for Structural and Operational Reforms Institutional Capacity Building 37
- 2 Component-3 Enabling Private Participation in RE Generation 37
- IDA US 52.6M 37
- Sub-component-3a Upstream Geothermal Site Preparation IDA US 52.6M 37
- 2. Strategic Assessment of Operating Context and Borrower 39
- Capability 39
- 2.1.Operational Context 39
- 2.2.Assessment of Client Capability and PIU 42
- 2.3.Market Research and Analysis 46
- 3. Procurement Risk Analysis 49
- 4. Procurement Objectives 51
- 5. Procurement Approach Options and Recommendation 52
- N o. Contract Description Catego ry 52
- Estimated Cost in US 52
- Attribute 54
- Selected arrangeme nt 54
- Justification SummaryLogic 54
- N o. Contract Description Categor y 56
- Estimated Cost in US 56
- Attribute Selected arrangement Justification SummaryLogic 58
- Attribute 60
- Selected arrangem ent 60
- Justification SummaryLogic 60
- 6. Preferred Arrangement for Low-Value Low-Risk Activities 61
- 7. Summary of PPSD to Support the Preparation of PAD by the Bank 64
- Annex 1 All Previous Similar Project Experience 65
- Annex 2 Proposed Contract 65
- Annex 3 Risk Analysis Based on Previous Experience 65
- Annex 4 Market Research Analysis 65
- Annex 5 Procurement Plan 66
- Annex 6 PPA Procurement Plan 67